Manufacturing

Measure operational excellence

From lean maturity to Industry 4.0 readiness, Benchly helps manufacturing leaders assess capability, put a number on the cost of standing still, and prioritise improvement across every team on site.

What is downtime really costing us?

Line 3 againBudget round next month
Try it with your own numbers

The cost of downtime, in the plant's own numbers.

BenchlyIQ

Downtime business case

What it adds up to

Unplanned downtime a year576 hrsDowntime you could prevent144 to 288 hrs
Worth, a year$576k to $1.2m

Assumes 12 months and that a quarter to a half of unplanned downtime can be prevented. Change the inputs to match your plant.

Your business case

  1. 1

    Today's cost

    About 576 hours of unplanned downtime a year, around $2.3m.

  2. 2

    What changes

    Preventing a quarter to a half of it is worth $576k to $1.2m a year.

  3. 3

    Check before you commit

    Log downtime causes on one line for a month, then decide.

They get:

A business case in their own numbers they can take to the budget round.

You learn:

Their scale, what downtime costs them and what the decision hinges on.

Illustrative experience
Why manufacturers use Benchly

From shop floor to boardroom

From the shop floor up

See the whole operation on one map

Run the same maturity check with operators, supervisors and managers. The map fills in as people answer, and you can compare departments to see where the gap between the boardroom's view and the floor's is widest.

  • Start from the Operational Excellence Scan or Supply Chain Resilience templates
  • Compare by department or by role
  • Groups under three people are never shown, so people answer honestly
Operational maturity: whole siteWhole team
Maintenance
Quality
Scheduling
Data
Skills
Safety
56/100
Compare by departmentProduction52Maintenance47Quality64Groups under three people are never shown.
Safety culture

Hear what the floor actually thinks

The Site Safety Culture Check asks the questions people don't raise in a toolbox talk. Everyone gets a result and recommendations from their answers; leaders see where the culture is strong and where to act.

  • Answer on a phone, on the floor, in a few minutes
  • Translate it for multilingual teams
  • Recommendations written from the answers, not a generic checklist
Site safety cultureYour results
63/ 100
Near-miss reportingPrioritySpeaking upReviewEquipment and PPEStrength
Where to start1Make near-miss reporting a two-minute job2Close the loop on every report within a week
A roadmap, not a report

Turn the results into a plan people can start on

Set the results out as a few ways forward, from quick wins on one line to a full programme. The one that fits the site's answers is picked out, with the others either side.

  • Recommendations prioritised by impact and effort
  • A lighter and a fuller option either side of the one that fits
  • Add a downtime business case in the plant's own numbers
Your improvement roadmap3 paths
Quick winsLog downtime causesDaily 10-minute huddle
RecommendedFor youQuick winsPlanned maintenanceShared line dashboard
Full programmeRecommendedCondition monitoringQuarterly re-check
What shaped thisMaintenanceMostly reactiveDataSpreadsheets per shiftDowntime8 hrs a month per line

Benchmark your operations

Start assessing operational maturity today.